Construction of Specimen with Moment Frame Structure and Spine
Test conducted 2020/12/07
Pre-experiment for create collapse model for buildings with weak beam-strong column
Test conducted 2020/11/30
Image analysis of inner wall and seismic performance of sprinkler
Test conducted 2020/11/27
Real size dhake table test for large unit house
Test conducted 2020/11/20
beam-to-column connection with RC slab experiment
Test series completed 2020/11/19
These are scenes of unit house beam-to-column connection experiment.
Test preparation 2020/11/13
These are scenes of the preparing of experiments in Tsukuba and Mr.Takahashi’s next test.
We took a picture for the graduation album
Test conducted 2020/10/19
Mr. Takahashi’s Cyclic loading test of moment resisting connections was conducted.